Tallow Wood Dr Roof & Gutters Clifton Park

Replaced garage roof and installed seamless gutters on Tallow Wood Dr in Clifton Park, NY, improving protection and water drainage

Client

Yang Wan

Date Completed

January 29, 2025

Location

Clifton Park NY

Project Overview

Top Gen Roofing completed a partial roof replacement over the garage and installed a new seamless gutter system. The roofing scope included removal of existing materials down to bare plywood, installation of full ice and water shield, starter shingles, and Owens Corning Brownwood shingles. Gutter work included 24 feet of new 5-inch K-style seamless gutters with one 2×3 downspout, installed with .023 aluminum coil and sealed with 50-year silicone. All debris was removed, and both services are backed by a lifetime guarantee on labor and materials.

Challenge

The front-facing section of the garage roof had deteriorated and required targeted replacement to prevent water intrusion. Additionally, the home’s guttering above the lower roof was outdated and ineffective, risking drainage problems during snowmelt and heavy rain.

Solution

Top Gen Roofing surgically replaced the garage roof section with Owens Corning Brownwood shingles and a full waterproofing barrier to restore integrity. A new 24-foot seamless K-style gutter with a single downspout was installed above the lower roof to enhance water management. Both systems were completed efficiently with minimal disruption and are covered by a lifetime labor and material guarantee, ensuring lasting peace of mind.

Schedule Your Free

Roof Inspection/Estimate Today!

Schedule a Fast, No-Obligation Estimate In Minutes!

View Completed Projects

John Doe

Chief Executive Officer

Share this post